Accelerating Approvals & Construction

Homes and ADUs on the Approval & Construction Accelerator have been reviewed for code compliance and are supported by Providers ready to make your home a reality.

Potential Homebuyers and Developers

Discover plans reviewed for code compliance in your state, with certified off-site builders ready to construct.

Start Your Search

Browse approved models

Filter by your state, design preference, and home size to discover residential and ADU designs that have already been reviewed for code compliance.

Connect with approved manufacturers

Each model is provided by an approved manufacturer ready to work with you to make your dream a reality. Connect directly with them from the model’s detail page.

Move-in faster

Because each design has already been reviewed for code compliance through an off-site construction program, your local permitting review moves significantly faster than custom one-off plans.

Want more details on how the Approval & Construction Accelerator accelerates the design and construction process?

The fast track to move-in day

The same path to a finished home, measured against a custom site-built one.

Traditional site-built

A longer, more sequential process, with a separate step at each stage.

ICC Accelerator

A faster path to the same home, with pre-approved plans and parallel work.

3–4 months saved
  • ~1.5–2.5 months from pre-approved plans
  • ~1–2 months from factory build

Plan

Traditional

Hire a designer and develop a custom building plan from scratch — weeks of drawings and revisions.

Accelerator

Select a ready-made design. The designer is already provided and the building plan is already drawn.

Skipped

Permit

Traditional

Submit the building plan for review, plus site plan and zoning — and wait in the queue for each.

Accelerator

Plan review is already passed for every hosted design. Only site plan and zoning remain.

Saves ~1.5–2.5 months

Finance

Traditional

Budgeting and land acquisition.

Accelerator

Budgeting and land acquisition — unchanged.

Same

Build

Traditional

Find and hire a contractor, then build sequentially on site: prep, foundation, framing, rough-ins, finish. Weather counts.

Accelerator

Factory assembly and site prep run in parallel, and the manufacturer’s contractor network installs it — no contractor search.

Saves ~1–2 months

Inspect

Traditional

Five separate site inspections — foundation, framing, rough-ins, insulation, final — each scheduled with the jurisdiction, each a possible delay.

Accelerator

Inspected continuously on the assembly line as it is built, so nothing waits on a site-visit calendar. On site: foundation and final only.

Built-in

Move in

Traditional

Certificate of Occupancy, after every sequential step above has finished.

Accelerator

Certificate of Occupancy 3–4 months sooner than a custom site-built home.

3–4 months sooner

ICC Approval & Construction Accelerator

The Approval & Construction Accelerator is an initiative of the International Code Council to support potential homebuyers and jurisdictions in accelerating the delivery of housing. The portal leverages the expertise of ICC-NTA in reviewing state-level plans for off-site construction and a network of manufacturers that can work with homebuyers to bring projects to fruition.

The Approval & Construction Accelerator is currently being piloted in selected states with Fading West, Veev by Lennar, and Stratford Homes as Founding Participants. Expansion to other states is anticipated upon completion of the pilot.